ZHS Locker Room Addition & PVE Site Drainage
Choose Plan Sheet:
»
VOLUME A - COVER SHEET
INDEX - A ABBREVIATIONS & INDEX INDEX A
1 - OF SHEET 9
2 - OF SHEET 9
3 - OF SHEET 9
GD1-0 - SITE DEMOLITION PLAN
GD1-1 - SITE DEMOLITION PLAN
G0-01 - LEGEND G0-01
G1-00 - OVERALL SITE PLAN
G1-01 - SITE PLAN
G1-02 - SITE PLAN
G2-00 - GRADING PLAN
G2-01 - G2-01
G3-00 - EROSION CONTROL PLAN
G3-01CONTROL PLAN - EROSION CONTROL PLAN
G4-00 - SITE DETAILS
SU1-0 - UTILITY PLAN
SU2-0 - UTILITY DETAILS
L2-00 - LANDSCAPE PLAN
L2-01DETAILS - LANDSCAPE DETAILS
S0-01 - GENERAL NOTES
S1-01 - FOUNDATION PLAN
S1-02 - S1-SLAB AND MASONRY PLAN
S2-01 - SECOND FLOOR FRAMING PLAN
S2-02 - ROOF FRAMING PLAN
S2-03 - ROOF FRAMING PLANS
S2-04 - RAMP FRAMING PLANS
S3-01 - FOUNDATION DETAILS
S3-02DETAILS - FOUNDATION DETAILS
S3-03 - FOUNDATION AND SLAB DETAILS
S3-04 - FOUNDATION AND SLAB DETAILS
S4-01DETAILS - MASONRY DETAILS
S4-02 - MASONRY DETAILS
S4-03LINTELS - MASONRY LINTELS
S4-04WALL ELEVATIONS - MASONRY WALL ELEVATIONS
S5-01 - MASONRY WALL ELEVATIONS
S5-02 - FRAMING DETAILS
S5-03 - FRAMING DETAILS
S5-04 - SECTIONS AND DETAILS
S5-05 - SECTIONS AND DETAILS
S5-06 - SECTIONS AND DETAILS
S5-07 - SECTIONS AND DETAILS
S5-08AND DETAILS - SECTIONS AND DETAILS
S5-09 - SECTIONS AND DETAILS
A-00 - WALL TYPES & DETAILS
A-01 - OVERALL FLOOR PLANS
AP-01 - CODE PLANS
FIRST FLOOR DEMOLITION PLAN - FIRST FLOOR DEMOLITION PLAN
AD-02 - SECOND FLOOR DEMOLITION PLAN
AD-03DEMOLITION PLAN - OUTBUILDING DEMOLITION PLAN
PLAN A-11 - FIRST FLOOR ARCHITECTURAL
PLAN A-12 - SECOND FLOOR ARCHITECTURAL
PLAN AC-11 - FIRST FLOOR REFLECTED CEILING
CEILING PLAN AC-12 - SECOND FLOOR REFLECTED
AR-01 - ROOF PLAN
A2-01ELEVATIONS - BUILDING ELEVATIONS
A3-01 - BUILDING
A3-02 - BUILDING SECTIONS
A3-03 - VERTICAL CIRCULATION
A3-04 - VERTICAL CIRCULATION
A3-05CIRCULATION - VERTICAL CIRCULATION
A3-10SECTIONS - WALL SECTIONS
A3-11 - WALL SECTIONS
A3-12 - WALL SECTIONS
A4-01 - ENLARGED TOILET ROOM PLANS
A4-02 - ENLARGED PLANS
A4-03 - ENLARGED PLANS
A5-01 - DETAILS
A5-02 - DETAILS
A5-03DETAILS - PLAN DETAILS
A6-01 - DOOR DETAILS
A6S-01AND FRAME SCHEDULE - DOOR AND FRAME SCHEDULE
AI-11 - FIRST FLOOR FINISH PLAN
AI-12 - SECOND FLOOR FINISH PLAN
AI-21ELEVATIONS - INTERIOR ELEVATIONS
AI-22 - INTERIOR ELEVATIONS
AI-51 - FLOOR PATTERN & FINISH DETAILS
AI-61 - LIST OF FINISHES
AQ-11 - FIRST FLOOR EQUIPMENT PLAN
AQ-12 - SECOND FLOOR EQUIPMENT PLAN
AQ-51TYPES - SIGNAGE TYPES
AQ-52ELEVATIONS & COURT - CASEWORK ELEVATIONS & COURT
AQ-61 - EQUIPMENT SCHEDULES & LOCKER
SYMBOLS & ABBREVIATIONS - P-00
FIRST FLOOR FIRE PROTECTION - PLAN F-11
SECOND FLOOR FIRE PROTECTION - PLAN F-12
EQUIPMENT PLATFORM FIRE - PROTECTION PLAN F-13
FOUNDATION PLUMBING - DEMOLITION PLAN PD-10
FIRST FLOOR PLUMBING - DEMOLITION PLAN PD-11
P-10 - FOUNDATION PLUMBING PLAN
P-11 - FIRST FLOOR PLUMBING PLAN
P-12 - SECOND FLOOR PLUMBING PLAN
PLAN P-13 - EQUIPMENT PLATFORM PLUMBING
P-14 - ROOF PLUMBING PLAN
DETAILS P-31 - PLUMBING SCHEDULES AND
P-32AND VENT ISOMETRICS - WASTE AND VENT ISOMETRICS
P-33AND VENT ISOMETRICS - WASTE AND VENT ISOMETRICS
P-41 - ENLARGED PLUMBING PLANS
P-42 - ENLARGED PLUMBING PLANS
M-00 - SYMBOLS
MD-11 - FIRST FLOOR DEMOLITION PLAN
MV-11 - FIRST FLOOR VENTILATION PLAN
TEMPERATURE CONTROL PLAN MP-11 - FIRST FLOOR PIPING &
MV-21 - SECOND FLOOR VENTILATION PLAN
MP-21FLOOR PIPING & - SECOND FLOOR PIPING & TEMPERATURE CONTROL PLAN
MR-01 - MECHANICAL ROOF PLAN
M3-01 - MECHANICAL SECTIONS
M4-01 - MECHANICAL ROOM
M5-01 - MECHANICAL DETAILS
M6-01 - MECHANICAL SCHEDULES
M7-01SCHEMATICS - MECHANICAL SCHEMATICS
E-01SYMBOL LEGEND - ELECTRICAL
E-02 - ELECTRICAL DETAILS
E-61 - LUMINAIRE SCHEDULE - ONE-LINE DIAGRAM
ED-11FLOOR ELECTRICAL - DEMOLITION PLAN ED-11
ED-12 - DEMOLITION PLAN
EF-11 - FIRST FLOOR FIRE ALARM PLAN
EF-12 - SECOND FLOOR FIRE ALARM PLAN
EL-11 - FIRST FLOOR LIGHTING PLAN
EL-12 - SECOND FLOOR LIGHTING PLAN
EP-11 - FIRST FLOOR POWER PLAN
EP-12 - SECOND FLOOR POWER PLAN
ES-01 - ELECTRICAL SITE PLAN
FIRST FLOOR TECHNOLOGY - ROUGH-IN PLAN ET-11
SECOND FLOOR TECHNOLOGY - ROUGH-IN PLAN ET-12
ET-51 - TECHNOLOGY ROUGH-IN DETAILS
ET-52 - TECHNOLOGY ROUGH-IN DETAILS
T-01 - ABBREVIATIONS
T-10 - FIRST FLOOR OVERALL TECHNOLOGY PLAN
TD-11FLOOR TECHNOLOGY DEMO - FLOOR TECHNOLOGY DEMO PLAN
T-11 - FIRST FLOOR TECHNOLOGY PLAN
T-12 - SECOND FLOOR TECHNOLOGY PLAN
T-51 - TECHNOLOGY DETAILS
T-52 - TECHNOLOGY DETAILS
VOLUME B - COVER SHEET
INDEX B - ABBREVIATIONS & INDEX
A-101 - OVERALL FIRST FLOOR PLAN
AC11B - FIRST FLOOR REFLECTED CEILING
AC11C - FIRST FLOOR REFLECTED CEILING PLAN - UNIT C AC11C
AC11D - FIRST FLOOR REFLECTED CEILING PLAN - UNIT D AC11D
AC11E - FIRST FLOOR REFLECTED CEILING PLAN - UNIT E
AF14B - FIRST FLOOR FINISH PLAN - UNIT B
AF14C - FIRST FLOOR FINISH PLAN - UNIT C
AF14D - FIRST FLOOR FINISH PLAN - UNIT D
AF14E - FIRST FLOOR FINISH PLAN - UNIT E
FP11B - FIRST ST FLOOR FIRE PROTECTION PLAN - UNIT B FP11B
FP11C - FIRST FLOOR FIRE PROTECTION PLAN - UNIT C
FP11D - FIRST FLOOR FIRE PROTECTION PLAN - UNIT D
FP11E - FIRST FLOOR FIRE PROTECTION PLAN - UNIT E
M-001 - SYMBOLS & ABBREVIATIONS
MV11B - VENTILATION PLAN - UNIT B
MV11C - VENTILATION PLAN - UNIT C
MV11D - VENTILATION PLAN - UNIT D
MV11E - VENTILATION PLAN - UNIT E
M-601 - MECHANICAL SCHEDULES
E-001 - ELECTRICAL SYMBOLS LEGEND & LUMINAIRE SCHEDULE
EL11B - FIRST FLOOR LIGHTING PLAN - UNIT B
EL11C - FIRST FLOOR LIGHTING PLAN - UNIT C
EL11D - FIRST FLOOR LIGHTING PLAN - UNIT D
EL11E - FIRST FLOOR LIGHTING PLAN - UNIT E
COVER SHEET - COVER SHEET
1 - BNDY 1
2 - BNDY 2
1 - TOPO 1
2 - TOPO 2
3 - TOPO 3
GD0.1 - GENERAL NOTES
GD1.2 - DEMOLITION PLAN
GD1.3 - DEMOLITION PLAN
GD1.4 - DEMOLITION PLAN
GD1.5 - DEMOLITION PLAN
G1.0 - OVERALL SITE PLAN
G1.2 - SITE PLAN
G1.3 - SITE PLAN
G1.4 - SITE PLAN
G1.5 - SITE PLAN
G2.3 - GRADING PLAN
G3.2 - EROSION CONTROL PLAN
G3.3 - EROSION CONTROL PLAN
G3.4 - EROSION CONTROL PLAN
G3.5 - EROSION CONTROL PLAN
G3.6 - EROSION CONTROL DETAILS
G4.1 - SITE DETAILS
G4.2 - SITE DETAILS
A1.01 - ROOF PLAN
A1.02 - BRICK CLEANING KEY
Page:
Next
Use Ctrl + mouse scroll wheel over the document to zoom.