Skillman Plan Room
Public Projects
Private Projects
Addendum Watch
Bid Tab Watch
Sign In/Register
Perry Township - Southport HS Addition & Renovation Phase 1 Activity Center Addition Wrestling
Information
Plan Holders
Plans
Shipping Information
Addenda
Bid Tab
Reference Items
Pre-Bid Information
Filter:
0010
COVER
COVER SHEET
0010-COVER_COVER SHEET.pdf
0020
LS001
LIFE SAFETY PLAN - FIRST FLOOR
0020-LS001_LIFE SAFETY PLAN - FIRST FLOOR.pdf
0030
LS002
LIFE SAFETY PLAN - SECOND FLOOR
0030-LS002_LIFE SAFETY PLAN - SECOND FLOOR.pdf
0040
C-0.0
COVER SHEET
0040-C-0.0_COVER SHEET.pdf
0050
C-1.0
GENERAL NOTES
0050-C-1.0_GENERAL _NOTES.pdf
0060
C-1.1
OVERALL PHASE LAYOUT
0060-C-1.1_OVERALL _PHASE LAYOUT.pdf
0070
C-2.0
EXISTING CONDITIONS
0070-C-2.0_EXISTING CONDITIONS.pdf
0080
C-3.0
OVERALL DEMO EROSION
0080-C-3.0_OVERALL DEMO _EROSION.pdf
0090
C-3.4
DEMO EROSION CONTROL PLAN
0090-C-3.4_DEMO EROSION _CONTROL PLAN.pdf
0100
C-4.0
DEMOLITION
0100-C-4.0_DEMOLITION.pdf
0110
C-4.4
DEMOLITION
0110-C-4.4_DEMOLITION.pdf
0120
C-5.0
OVERALL EROSION
0120-C-5.0_OVERALL _EROSION.pdf
0130
C-5.4
EROSION CONTROL PLAN
0130-C-5.4_EROSION _CONTROL PLAN.pdf
0140
C-5.5
OVERALL POST-EROSION
0140-C-5.5_OVERALL _POST-EROSION.pdf
0150
C-5.9
POST-EROSION CONTROL PLAN
0150-C-5.9_POST-EROSION _CONTROL PLAN.pdf
0160
C-5.10
SWPPP NOTES CSGP)
0160-C-5.10_SWPPP NOTES _CSGP).pdf
0170
C-5.11
EROSION CONTROL PLAN
0170-C-5.11_EROSION _CONTROL PLAN.pdf
0180
C-5.12
EROSION CONTROL PLAN
0180-C-5.12_EROSION _CONTROL PLAN.pdf
0190
C-6.0
SITE PLAN
0190-C-6.0_SITE PLAN.pdf
0200
C-6.4
SITE PLAN
0200-C-6.4_SITE PLAN.pdf
0210
C-8.15
STORM DETAILS
0210-C-8.15_STORM _DETAILS.pdf
0220
C-8.16
STORM DETAILS
0220-C-8.16_STORM _DETAILS.pdf
0230
C-6.5
SITE PLAN
0230-C-6.5_SITE PLAN.pdf
0240
C-6.6
SITE DETAILS
0240-C-6.6_SITE DETAILS.pdf
0250
C-7.0
GRADING PLAN
0250-C-7.0_GRADING PLAN.pdf
0260
C-7.4
GRADING PLAN
0260-C-7.4_GRADING PLAN.pdf
0270
C-7.5
GRADING PLAN
0270-C-7.5_GRADING PLAN.pdf
0280
C-8.0
STORM LAYOUT
0280-C-8.0_STORM LAYOUT.pdf
0290
C-8.4
STORM LAYOUT
0290-C-8.4_STORM LAYOUT.pdf
0300
C-8.5
STORM LAYOUT
0300-C-8.5_STORM LAYOUT.pdf
0310
C-8.6
STORM LAYOUT
0310-C-8.6_STORM LAYOUT.pdf
0320
C-8.8
PHASE 1 STORM
0320-C-8.8_PHASE 1 _STORM.pdf
0330
C-8.9
PHASE 1 STORM
0330-C-8.9_PHASE 1 _STORM.pdf
0340
C-8.10
PHASE 1 STORM
0340-C-8.10_PHASE 1 _STORM.pdf
0350
C-8.11
PHASE 1 STORM
0350-C-8.11_PHASE 1 _STORM.pdf
0360
C-8.12
PHASE 1 STORM
0360-C-8.12_PHASE 1 _STORM.pdf
0370
C-8.17
STORM DETAILS
0370-C-8.17_STORM _DETAILS.pdf
0380
C-9.0
UTILITY PLAN
0380-C-9.0_UTILITY PLAN.pdf
0390
C-9.4
UTILITY PLAN
0390-C-9.4_UTILITY PLAN.pdf
0400
C-9.5
UTILITY PLAN
0400-C-9.5_UTILITY PLAN.pdf
0410
C-9.6
UTILITY DETAILS
0410-C-9.6_UTILITY _DETAILS.pdf
0420
C-9.7
UTILITY DETAILS
0420-C-9.7_UTILITY _DETAILS.pdf
0430
C-9.8
UTILITY DETAILS
0430-C-9.8_UTILITY _DETAILS.pdf
0440
S001
GENERAL NOTES & ABBREVIATIONS
0440-S001_GENERAL NOTES & ABBREVIATIONS.pdf
0450
S010
LOAD MAP
0450-S010_LOAD MAP.pdf
0460
S011
LOAD MAP
0460-S011_LOAD MAP.pdf
0470
S020
LEGENDS
0470-S020_LEGENDS.pdf
0480
SD100
OVERALL DEMO PLAN
0480-SD100_OVERALL DEMO PLAN.pdf
0490
SD101Q
UNIT Q DEMO PLAN
0490-SD101Q_UNIT Q DEMO PLAN.pdf
0500
SD101R
UNIT R DEMO PLAN
0500-SD101R_UNIT R DEMO PLAN.pdf
0510
SD400
ENLARGED DEMO PLANS
0510-SD400_ENLARGED DEMO PLANS.pdf
0520
S100
PHASE 1 OVERALL FOUNDATION PLAN
0520-S100_PHASE 1 OVERALL FOUNDATION PLAN.pdf
0530
S101Q
UNIT Q FOUNDATION PLAN
0530-S101Q_UNIT Q FOUNDATION PLAN.pdf
0540
S101R
UNIT R FOUNDATION PLAN
0540-S101R_UNIT R FOUNDATION PLAN.pdf
0550
S101S
UNIT S FOUNDATION PLAN
0550-S101S_UNIT S FOUNDATION PLAN.pdf
0560
S110
PHASE 1 OVERALL ROOF FRAMING PLAN
0560-S110_PHASE 1 OVERALL ROOF FRAMING PLAN.pdf
0570
S112
PHASE 1 OVERALL ROOF FRAMING PLAN
0570-S112_PHASE 1 OVERALL ROOF FRAMING PLAN.pdf
0580
S113
PHASE 1 OVERALL ROOF FRAMING PLAN
0580-S113_PHASE 1 OVERALL ROOF FRAMING PLAN.pdf
0590
S114Q
UNIT Q ROOF FRAMING PLAN
0590-S114Q_UNIT Q ROOF FRAMING PLAN.pdf
0600
S114R
UNIT R ROOF FRAMING PLAN
0600-S114R_UNIT R ROOF FRAMING PLAN.pdf
0610
S114S
UNIT S ROOF FRAMING PLAN
0610-S114S_UNIT S ROOF FRAMING PLAN.pdf
0620
SLOT IN BRACE AT GUSSET GUSSET THICKNESS + 1
16 ABBREVIATIONS = TENSION MEMBERS CONNECTION THE CENTER OF BOLTE
0620-SLOT IN BRACE AT GUSSET GUSSET THICKNESS + 1_16_ _ABBREVIATIONS_ _= TENSION_MEMBER'S CONNECTION THE CENTER OF BOLTE.pdf
0630
S201
FRAMING ELEVATIONS
0630-S201_FRAMING ELEVATIONS.pdf
0640
S300
BUILDING SECTIONS
0640-S300_BUILDING SECTIONS.pdf
0650
S301
BUILDING SECTION
0650-S301_BUILDING SECTION.pdf
0660
S400
ENLARGED FOUNDATION PLANS
0660-S400_ENLARGED FOUNDATION PLANS.pdf
0670
S410
ENLARGED FRAMING PLANS
0670-S410_ENLARGED FRAMING PLANS.pdf
0680
S500
FOUNDATION SECTIONS
0680-S500_FOUNDATION SECTIONS.pdf
0690
S501
FOUNDATION SECTIONS
0690-S501_FOUNDATION SECTIONS.pdf
0700
S510
FOUNDATION SCHEDULES SECTIONS & DETAILS
0700-S510_FOUNDATION SCHEDULES SECTIONS & DETAILS.pdf
0710
S511
FOUNDATION SCHEDULES SECTIONS & DETAILS
0710-S511_FOUNDATION SCHEDULES SECTIONS & DETAILS.pdf
0720
S512
FOUNDATION SCHEDULES SECTIONS & DETAILS
0720-S512_FOUNDATION SCHEDULES SECTIONS & DETAILS.pdf
0730
S513
FOUNDATION SCHEDULES SECTIONS & DETAILS
0730-S513_FOUNDATION SCHEDULES SECTIONS & DETAILS.pdf
0740
S514
GRADE BEAM DETAILS AND ELEVATIONS
0740-S514_GRADE BEAM DETAILS AND ELEVATIONS.pdf
0750
S515
FOUNDATIONS SCHEDULES SECTIONS & DETAILS
0750-S515FOUNDATIONS SCHEDULES SECTIONS & DETAILS.pdf
0760
2520
MASONRY SCHEDULES SECTIONS & DETAILS
0760-2520_MASONRY SCHEDULES SECTIONS & DETAILS.pdf
0770
S521
MASONRY SCHEDULES SECTIONS & DETAILS
0770-S521_MASONRY SCHEDULES SECTIONS & DETAILS.pdf
0780
S530
PRECAST SCHEDULES SECTIONS & DETAILS
0780-S530_PRECAST SCHEDULES SECTIONS & DETAILS.pdf
0790
S540
FRAMING SCHEDULES SECTIONS & DETAILS
0790-S540_FRAMING SCHEDULES SECTIONS & DETAILS.pdf
0800
S541
FRAMING SCHEDULES SECTIONS & DETAILS
0800-S541_FRAMING SCHEDULES SECTIONS & DETAILS.pdf
0810
S542
FRAMING SCHEDULES SECTIONS & DETAILS
0810-S542_FRAMING SCHEDULES SECTIONS & DETAILS.pdf
0820
S543
FRAMING SCHEDULES SECTIONS & DETAILS
0820-S543_FRAMING SCHEDULES SECTIONS & DETAILS.pdf
0830
S544
FRAMING SCHEDULES SECTIONS & DETAILS
0830-S544_FRAMING SCHEDULES SECTIONS & DETAILS.pdf
0840
S700
SPECIAL INSPECTIONS
0840-S700_SPECIAL INSPECTIONS.pdf
0850
S701
SPECIAL INSPECTIONS
0850-S701_SPECIAL INSPECTIONS.pdf
0860
A001
ARCHITECTURAL GENERAL NOTES
0860-A001_ARCHITECTURAL GENERAL NOTES.pdf
0870
A002
INTERIOR TYPES
0870-A002_INTERIOR TYPES.pdf
0880
A003
EXTERIOR TYPES
0880-A003_EXTERIOR TYPES.pdf
0890
A011
SITE PLAN
0890-A011_SITE PLAN.pdf
0900
AD101Q
DEMOLITION PLAN - FIRST FLOOR - UNIT Q
0900-AD101Q_DEMOLITION PLAN - FIRST FLOOR - UNIT Q.pdf
0910
AD101R
DEMOLITION PLAN - FIRST FLOOR - UNIT R
0910-AD101R_DEMOLITION PLAN - FIRST FLOOR - UNIT R.pdf
0920
A101Q
FLOOR PLAN FIRST FLOOR - UNIT Q
0920-A101Q_FLOOR PLAN FIRST FLOOR - UNIT Q.pdf
0930
A101R
FLOOR PLAN FIRST FLOOR - UNIT R
0930-A101R_FLOOR PLAN FIRST FLOOR - UNIT R.pdf
0940
A101S
FLOOR PLAN FIRST FLOOR - UNIT S
0940-A101S_FLOOR PLAN FIRST FLOOR - UNIT S.pdf
0950
A111
ENLARGED PLANS
0950-A111_ENLARGED PLANS.pdf
0960
A112
ENLARGED PLANS
0960-A112_ENLARGED PLANS.pdf
0970
A121Q
REFLECTED CEILING PLAN FIRST FLOOR - UNIT Q
0970-A121Q_REFLECTED CEILING PLAN FIRST FLOOR - UNIT Q.pdf
0980
A121R
REFLICTED CEILING PLAN FIRST FLOOR- UNIT R
0980-A121R_REFLICTED CEILING PLAN FIRST FLOOR- UNIT R.pdf
0990
R121S
REFLICTED CEILING PLAN FIRST FLOOR - UNIT S
0990-R121S_REFLICTED CEILING PLAN FIRST FLOOR - UNIT S.pdf
1000
A141
ROOF PLAN
1000-A141_ROOF PLAN.pdf
1010
A142
ROOF DETAILS
1010-A142_ROOF DETAILS.pdf
1020
A201
EXTERIOR ELEVATIONS
1020-A201_EXTERIOR ELEVATIONS.pdf
1030
A202
EXTERIOR ELEVATIONS
1030-A202_EXTERIOR ELEVATIONS.pdf
1040
A203
EXTERIOR ELEVATIONS
1040-A203_EXTERIOR ELEVATIONS.pdf
1050
A301
BUILDING SECTIONS
1050-A301_BUILDING SECTIONS.pdf
1060
A302
BUILDING SECTIONS
1060-A302_BUILDING SECTIONS.pdf
1070
A311
WALL SECTIONS
1070-A311_WALL SECTIONS.pdf
1080
A312
WALL SECTIONS
1080-A312_WALL SECTIONS.pdf
1090
A313
WALL SECTIONS
1090-A313_WALL SECTIONS.pdf
1100
A314
WALL SECTIONS
1100-A314_WALL SECTIONS.pdf
1110
A401
VERITCAL CIRCULATION
1110-A401_VERITCAL CIRCULATION.pdf
1120
A402
VERTICAL CIRCULATION
1120-A402_VERTICAL CIRCULATION.pdf
1130
A501
PLAN & SECTION DETAILS
1130-A501_PLAN & SECTION DETAILS.pdf
1140
A501
SECTION DETAILS
1140-A501_SECTION DETAILS.pdf
1150
A503
SECTION DETAILS
1150-A503_SECTION DETAILS.pdf
1160
A601A
DOOR SCHEDULE PHASE 1
1160-A601A_DOOR SCHEDULE PHASE 1.pdf
1170
A602
DOOR DETAILS
1170-A602_DOOR DETAILS.pdf
1180
A611
WINDOW SCHEDULE
1180-A611_WINDOW SCHEDULE.pdf
1190
A612
WINDOW SCHEDULE
1190-A612_WINDOW SCHEDULE.pdf
1200
A720
FINISH LEGEND
1200-A720_FINISH LEGEND.pdf
1210
A721Q
INTERIOR FINISH PLAN FIRST FLOOR - UNIT Q
1210-A721Q_INTERIOR FINISH PLAN FIRST FLOOR - UNIT Q.pdf
1220
A721R
INTERIOR FINISH PLAN FIRST FLOOR - UNIT R
1220-A721R_INTERIOR FINISH PLAN FIRST FLOOR - UNIT R.pdf
1230
A721S
INTERIOR FINISH PLAN FIRST FLOOR - UNIT S
1230-A721S_INTERIOR FINISH PLAN FIRST FLOOR - UNIT S.pdf
1240
A731
INTERIOR DETAILS
1240-A731-INTERIOR DETAILS.pdf
1250
A751
INTERIOR ELEVATIONS
1250-A751_INTERIOR ELEVATIONS.pdf
1260
A752
INTERIOR ELEVATIONS
1260-A752_INTERIOR ELEVATIONS.pdf
1270
A753
INTERIOR ELEVATIONS
1270-A753_INTERIOR ELEVATIONS.pdf
1280
A754
INTERIOR ELEVATIONS
1280-A754_INTERIOR ELEVATIONS.pdf
1290
A755
INTERIOR ELEVATIONS
1290-A755_INTERIOR ELEVATIONS.pdf
1300
A761
CASEWORK ELEVATIONS & SECTIONS
1300-A761_CASEWORK ELEVATIONS & SECTIONS.pdf
1310
A901
3D VIEWS
1310-A901_3D VIEWS.pdf
1320
A902
3D VIEWS
1320-A902_3D VIEWS.pdf
0010
COVER
COVER SHEET
0010-COVER_COVER SHEET.pdf
0020
P-001
PLUMBING SYMBOLS AND ABBREVIATIONS
0020-P-001_PLUMBING _SYMBOLS AND _ABBREVIATIONS.pdf
0030
FP101
FIRE PROTECTION FIRST FLOOR
0030-FP101_FIRE _PROTECTION _FIRST FLOOR.pdf
0040
PF101
PLUMBING FOUNDATION PLAN - UNIT Q
0040-PF101_PLUMBING _FOUNDATION _PLAN - UNIT Q.pdf
0050
PF102
PLUMBING FOUNDATION PLAN - UNIT R
0050-PF102_PLUMBING _FOUNDATION _PLAN - UNIT R.pdf
0060
PP101
PLUMBING FIRST FLOOR PLAN - UNIT Q
0060-PP101_PLUMBING _FIRST FLOOR _PLAN - UNIT Q.pdf
0070
PP102
PLUMBING FIRST FLOOR PLAN-UNIT R
0070-PP102_PLUMBING _FIRST FLOOR _PLAN-UNIT R.pdf
0080
PP103
PLUMBING VAULT FLOOR PLANS - UNIT Q
0080-PP103_PLUMBING _VAULT FLOOR _PLANS - UNIT Q.pdf
0090
PR101
PLUMBING ROOF PLAN
0090-PR101_PLUMBING _ROOF PLAN.pdf
0100
P-301
PLUMBING SECTIONS
0100-P-301_PLUMBING _SECTIONS.pdf
0110
P-401
PLUMBING ENLARGED PLANS
0110-P-401_PLUMBING _ENLARGED _PLANS.pdf
0120
P-501
PLUMBING DETAILS
0120-P-501_PLUMBING _DETAILS.pdf
0130
P-601
PLUMBING SCHEDULES
0130-P-601_PLUMBING _SCHEDULES.pdf
0140
P-901
DOMESTIC WATER ISOMETRIC
0140-P-901_DOMESTIC _WATER _ISOMETRIC.pdf
0150
P-902
SANITARY WASTE AND VENT
0150-P-902_SANITARY _WASTE AND _VENT.pdf
0160
P-903
GAS PIPING ISOMETRIC
0160-P-903_GAS PIPING _ISOMETRIC.pdf
0170
M-001
MECHANICAL SYMBOLS AND ABBREVIATIONS
0170-M-001_MECHANICAL _SYMBOLS AND _ABBREVIATIONS.pdf
0180
MD100
MECHANICAL DEMOLITION BASEMENT
0180-MD100_MECHANICAL _DEMOLITION _BASEMENT.pdf
0190
MD101
MECHANICAL DEMOLITION FIRST FLOOR
0190-MD101_MECHANICAL _DEMOLITION _FIRST FLOOR.pdf
0200
MD102
MECHANICAL DEMOLITION FIRST FLOOR
0200-MD102_MECHANICAL _DEMOLITION _FIRST FLOOR.pdf
0210
MD103
MECHANICAL DEMOLITION FIRST FLOOR
0210-MD103_MECHANICAL _DEMOLITION _FIRST FLOOR.pdf
0220
MH100
MECHANICAL HVAC BASEMENT
0220-MH100_MECHANICAL _HVAC _BASEMENT.pdf
0230
MH101
MECHANICAL HVAC FIRST FLOOR PLAN -
0230-MH101_MECHANICAL _HVAC FIRST _FLOOR PLAN -.pdf
0240
MH102
MECHANICAL HVAC FIRST FLOOR PLAN -
0240-MH102_MECHANICAL _HVAC FIRST _FLOOR PLAN -.pdf
0250
MH103
MECHANICAL HVAC FIRST FLOOR PLAN -
0250-MH103_MECHANICAL _HVAC FIRST _FLOOR PLAN -.pdf
0260
MP101
MECHANICAL PIPING FIRST FLOOR PLAN -
0260-MP101_MECHANICAL _PIPING FIRST _FLOOR PLAN -.pdf
0270
MP102
MECHANICAL PIPING FIRST FLOOR PLAN -
0270-MP102_MECHANICAL _PIPING FIRST _FLOOR PLAN -.pdf
0280
MR101
MECHANICAL ROOF PLAN - UNIT Q, R, S
0280-MR101_MECHANICAL _ROOF PLAN - _UNIT Q, R, S.pdf
0290
M-301
MECHANICAL SECTIONS
0290-M-301_MECHANICAL _SECTIONS.pdf
0300
M-501
MECHANICAL DETAILS
0300-M-501_MECHANICAL _DETAILS.pdf
0310
M-502
MECHANICAL DETAILS
0310-M-502_MECHANICAL _DETAILS.pdf
0320
M-601
MECHANICAL SCHEDULES
0320-M-601_MECHANICAL _SCHEDULES.pdf
0330
M-701
TEMPERATURE CONTROLS SCHEMATICS
0330-M-701_TEMPERATURE _CONTROLS _SCHEMATICS.pdf
0350
E-001
ELECTRICAL SYMBOLS AND ABBREVIATIONS
0350-E-001_ELECTRICAL _SYMBOLS AND _ABBREVIATIONS.pdf
0360
ED100
ELECTRICAL SITE DEMOLITION
0360-ED100_ELECTRICAL _SITE _DEMOLITION.pdf
0370
ED101
ELECTRICAL DEMOLITION BASEMENT
0370-ED101_ELECTRICAL _DEMOLITION _BASEMENT.pdf
0380
ED102
ELECTRICAL DEMOLITION FIRST FLOOR
0380-ED102_ELECTRICAL _DEMOLITION _FIRST FLOOR.pdf
0390
ED103
ELECTRICAL DEMOLITION FIRST FLOOR
0390-ED103_ELECTRICAL _DEMOLITION _FIRST FLOOR.pdf
0400
ES101
ELECTRICAL SITE PLAN
0400-ES101_ELECTRICAL _SITE PLAN.pdf
0410
EL101
ELECTICAL LIGHTING BASEMENT
0410-EL101_ELECTICAL _LIGHTING _BASEMENT.pdf
0420
EL102
ELECTICAL LIGHTING FIRST FLOOR PLAN -
0420-EL102_ELECTICAL _LIGHTING FIRST _FLOOR PLAN -.pdf
0430
EL103
ELECTICAL LIGHTING FIRST FLOOR PLAN -
0430-EL103_ELECTICAL _LIGHTING FIRST _FLOOR PLAN -.pdf
0440
EL104
ELECTICAL LIGHTING FIRST FLOOR PLAN -
0440-EL104_ELECTICAL _LIGHTING FIRST _FLOOR PLAN -.pdf
0450
EP101
ELECTRICAL POWER BASEMENT
0450-EP101_ELECTRICAL _POWER _BASEMENT.pdf
0460
EP102
ELECTRICAL POWER FIRST FLOOR PLAN -
0460-EP102_ELECTRICAL _POWER FIRST _FLOOR PLAN -.pdf
0470
EP103
ELECTRICAL POWER FIRST FLOOR PLAN -
0470-EP103_ELECTRICAL _POWER FIRST _FLOOR PLAN -.pdf
0480
EP104
ELECTRICAL POWER FIRST FLOOR PLAN -
0480-EP104_ELECTRICAL _POWER FIRST _FLOOR PLAN -.pdf
0490
ER101
ELECTRICAL ROOF PLAN
0490-ER101_ELECTRICAL _ROOF PLAN.pdf
0500
EF101
ELECTRICAL FIRE ALARM FIRST FLOOR
0500-EF101_ELECTRICAL _FIRE ALARM _FIRST FLOOR.pdf
0510
EF102
ELECTRICAL FIRE ALARM FIRST FLOOR
0510-EF102_ELECTRICAL _FIRE ALARM _FIRST FLOOR.pdf
0520
EF103
ELECTRICAL FIRE ALARM FIRST FLOOR
0520-EF103_ELECTRICAL _FIRE ALARM _FIRST FLOOR.pdf
0530
E-501
ELECTRICAL GENERAL DETAILS
0530-E-501_ELECTRICAL _GENERAL _DETAILS.pdf
0540
E-502
ELECTRICAL LIGHTING DETAILS
0540-E-502_ELECTRICAL _LIGHTING _DETAILS.pdf
0550
E-503
ELECTRICAL GROUNDING DETAILS
0550-E-503_ELECTRICAL _GROUNDING _DETAILS.pdf
0560
E-504
ELECTRICAL POWER DETAILS
0560-E-504_ELECTRICAL _POWER _DETAILS.pdf
0570
E-601
ELECTRICAL SCHEDULES
0570-E-601_ELECTRICAL _SCHEDULES.pdf
0580
E-602
ELECTRICAL PANELBOARD SCHEDULES
0580-E-602_ELECTRICAL _PANELBOARD _SCHEDULES.pdf
0590
E-701
ELECTRICAL ONE-LINE DIAGRAMS
0590-E-701_ELECTRICAL _ONE-LINE _DIAGRAMS.pdf
0600
T000
TECHNOLOGY RESPONSIBILITY MATRIX
0600-T000_TECHNOLOGY _RESPONSIBILITY _MATRIX.pdf
0610
TD101
FIRST FLOOR DEMOLITION PLAN -
0610-TD101_FIRST FLOOR _DEMOLITION _PLAN -.pdf
0620
TD101Q
FIRST FLOOR DEMOLITION PLAN - UNIT Q
0620-TD101Q_FIRST FLOOR _DEMOLITION _PLAN - UNIT Q.pdf
0630
TD101R
FIRST FLOOR DEMOLITION PLAN - UNIT R
0630-TD101R_FIRST FLOOR _DEMOLITION _PLAN - UNIT R.pdf
0640
TD102
SECOND FLOOR DEMOLITION PLAN -
0640-TD102_SECOND FLOOR _DEMOLITION _PLAN -.pdf
0650
T101
FIRST FLOOR DISTRIBUTION PLAN -
0650-T101_FIRST FLOOR _DISTRIBUTION _PLAN -.pdf
0660
T101Q
FIRST FLOOR DISTRIBUTION PLAN - UNIT Q
0660-T101Q_FIRST FLOOR _DISTRIBUTION _PLAN - UNIT Q.pdf
0670
T101R
FIRST FLOOR DISTRIBUTION PLAN - UNIT R
0670-T101R_FIRST FLOOR _DISTRIBUTION _PLAN - UNIT R.pdf
0680
T101S
FIRST FLOOR DISTRIBUTION PLAN - UNIT S
0680-T101S_FIRST FLOOR _DISTRIBUTION _PLAN - UNIT S.pdf
0690
T102
SECOND FLOOR DISTRIBUTION PLAN -
0690-T102_SECOND FLOOR _DISTRIBUTION _PLAN -.pdf
0700
T201Q
FIRST FLOOR TECHNOLOGY PLAN - UNIT Q
0700-T201Q_FIRST FLOOR _TECHNOLOGY _PLAN - UNIT Q.pdf
0710
T201R
FIRST FLOOR TECHNOLOGY PLAN - UNIT R
0710-T201R_FIRST FLOOR _TECHNOLOGY _PLAN - UNIT R.pdf
0720
T201S
FIRST FLOOR TECHNOLOGY PLAN - UNIT S
0720-T201S_FIRST FLOOR _TECHNOLOGY _PLAN - UNIT S.pdf
0730
T300
TELECOM DIAGRAMS
0730-T300_TELECOM _DIAGRAMS.pdf
0740
T301
TELECOM DIAGRAMS
0740-T301_TELECOM _DIAGRAMS.pdf
0750
T302
ENLARGED TR LAYOUTS - NEW
0750-T302_ENLARGED TR _LAYOUTS - NEW.pdf
0760
T303
AV DIAGRAMS
0760-T303_AV DIAGRAMS.pdf
0770
T304
AV DIAGRAMS
0770-T304_AV DIAGRAMS.pdf
0780
T305
RACK ELEVATIONS
0780-T305_RACK _ELEVATIONS.pdf
0790
T400
TECHNOLOGY DETAILS
0790-T400_TECHNOLOGY _DETAILS.pdf
0800
T401
TECHNOLOGY DETAILS
0800-T401_TECHNOLOGY _DETAILS.pdf
0810
T402
TECHNOLOGY DETAILS
0810-T402_TECHNOLOGY _DETAILS.pdf
0820
T403
SECURITY DETAILS
0820-T403_SECURITY _DETAILS.pdf
0830
T404
SECURITY DETAILS
0830-T404_SECURITY _DETAILS.pdf
0840
T405
AV ELEVATIONS
0840-T405_AV ELEVATIONS.pdf
0850
T406
AV ELEVATIONS
0850-T406_AV ELEVATIONS.pdf
0860
T407
AV ELEVATIONS
0860-T407_AV ELEVATIONS.pdf
0870
T408
AV ELEVATIONS
0870-T408_AV ELEVATIONS.pdf
0880
T409
DISTRIBUTION ELEVATIONS
0880-T409_DISTRIBUTION _ELEVATIONS.pdf
0890
T410
DISTRIBUTION ELEVATIONS
0890-T410_DISTRIBUTION _ELEVATIONS.pdf
0900
T411
DISTRIBUTION ELEVATIONS
0900-T411_DISTRIBUTION _ELEVATIONS.pdf
0910
T500
TECHNOLOGY SECURITY SCHEDULES
0910-T500_TECHNOLOGY_ _SECURITY _SCHEDULES.pdf
If you need assistance with the plan room please contact
Eastern Engineering here
or call Eastern Engineering Fishers at
(317) 598-0661
.
© Copyright Eastern Engineering 2001-2024